How to Hire a Sewer Contractor in Georgia
Georgia draws a line most states do not: a master plumber or a licensed utility contractor may work the pipe from the property line toward the house, and anything five feet or deeper in the public way becomes utility contracting. This guide explains both licenses, Atlanta permits, where responsibility ends, and what shapes a bid.
Estimates are free. Call now. · Open 24 hours, 7 days a week
Fletch Barney TrenchlessGeorgia's verified sewer contractor, based in Georgia
Who licenses sewer contractors in Georgia
Georgia licenses people and companies through boards at the Secretary of State. The Division of Master and Journeyman Plumbers issues Journeyman, Master Plumber Class I and Master Plumber Class II licenses; Class I is limited to single-family and small two-family dwellings plus commercial buildings under ten thousand square feet, while Class II has no cap. Only a licensed master may own a plumbing business, and the board does not register companies, so the name on the license is the person you check. The Georgia Board of Utility Contractors licenses companies that install or access utility systems five feet or deeper by trenching, including sanitary sewer, and each must employ a licensed Utility Manager. The statute allows either credential to work the lateral from the property line to within five feet of the house. Verify both through GOALS, the Secretary of State's licensing system. Insist on liability and workers' compensation certificates.
Permits and inspections
Lateral work in Georgia is permitted by the local building department under the Georgia State Plumbing Code, with the sewer utility controlling the connection. In Atlanta, the Office of Buildings issues the plumbing permit while the Department of Watershed Management owns the sewer and must approve any tie-in or work on its cleanout. Gwinnett County Water Resources and DeKalb County Watershed Management fill the utility role in those counties, with county development departments issuing permits. Savannah and Augusta run both through city offices. A street cut requires a right-of-way permit from the city, county or Georgia DOT. Georgia 811 must be notified two business days before digging. The master plumber or utility contractor pulls the permit.
Who owns the pipe under the street
Metro Atlanta utilities generally make the owner responsible for the entire lateral, including the connection to the public main. Gwinnett County states it directly: the private lateral extends to the edge of the right-of-way and the owner is responsible for all of it including the tie-in, while the county maintains only the cleanout it set at the right-of-way line. If a house has two cleanouts, the one nearest the street is the county's. DeKalb and Atlanta follow the same principle and have offered assistance to income-qualified owners. Savannah and some smaller cities take over at the property line, so confirm locally. Georgia has no point-of-sale lateral inspection law. The utility sets the tap.
What is under Georgia, and why it shapes the bid
Georgia's red Piedmont clay is the defining soil north of the fall line. It holds water, swells, and shears clay-pipe joints, and in Atlanta neighborhoods built before 1960 the lateral is usually vitrified clay or cast iron, often with Orangeburg in 1950s and 1960s subdivisions. Granite outcrops around Stone Mountain and shallow bedrock in the northern suburbs turn trenches into rock jobs. South of the fall line, Macon and Savannah sit on sandy coastal-plain soils with high groundwater, where dewatering and trench boxes matter more than rock. Frost is shallow statewide, so laterals are not deep, but mature oaks and sweetgums send roots into every joint. Lining suits long clay runs; open cut suits short ones.
For the lining methods themselves, the Sewer Pipe Lining Georgia pipe lining guide goes into what fails in the ground here and which method fits.
What a Georgia sewer bid must include
- The Master Plumber Class I or II license, or the Utility Contractor license, verifiable in GOALS.
- The city or county plumbing permit, the utility approval, and who pulls each.
- Rock excavation in the northern suburbs or dewatering in the coastal plain priced as unit items.
- Who performs the tie-in at the public main and whether the county cleanout is touched.
- Right-of-way permit and pavement restoration to the city or Georgia DOT standard.
The full checklist, for any state, is on what a sewer bid should include.
Red flags in Georgia
- A license number that does not appear in the Georgia GOALS licensee search.
- A Class I master plumber bidding a large commercial building beyond that class.
- A claim that Gwinnett or Atlanta needs no permit for a lateral on private land.
- No Georgia 811 ticket before the excavator arrives.
A vetted sewer contractor in Georgia
Sewer repair, lining, bursting and replacement in Georgia are performed by Georgia lining crews at Fletch Barney Trenchless, covering metro Atlanta and projects across Georgia. They are listed in the CIPP Verified Installer directory, which means licensing, completed work and equipment were checked before the listing went live, and every bid starts with a recorded camera inspection.
Estimates are free. Call now. (877) 959-0155
Where Georgia property owners ask for help most
The rules above apply statewide; the communities below are the ones that generate the most questions.
Georgia sewer contractor questions
Who licenses Georgia sewer work?
Two boards at the Georgia Secretary of State: the Division of Master and Journeyman Plumbers for plumbers and the Board of Utility Contractors for companies working utility systems five feet or deeper. Either may repair a lateral.
Who owns a Gwinnett, Georgia lateral?
The property owner. Gwinnett County holds the owner responsible for the private lateral all the way to the public sewer, including the connection, and maintains only the cleanout it installed at the right-of-way. Metro Atlanta follows suit.
Georgia Class I versus Class II?
A Class I Master Plumber may work on single-family homes, small two-family dwellings and commercial buildings under ten thousand square feet. Class II has no restriction. For a Georgia apartment complex or large commercial lateral, ask for Class II first.
Does Atlanta require a lateral permit?
Yes. The Office of Buildings issues the plumbing permit and the Department of Watershed Management must approve any work touching its sewer or cleanout. Street cuts add a right-of-way permit. Georgia law also requires an 811 locate.
Why does red clay matter in Georgia?
Piedmont clay swells when wet and shrinks when dry, shearing old clay-pipe joints and letting roots in. Trenches in it need shoring and careful bedding. Georgia contractors often prefer lining on long runs because digging clay is slow.
The short version for Georgia
In Georgia, get a camera inspection first and keep the file. Confirm the master plumber or utility contractor in GOALS. Ask the county or city utility where its responsibility ends and whether the right-of-way cleanout is theirs. Compare bids on rock, groundwater and restoration. Pay the balance only after the inspection passes or the post-lining video arrives in your inbox.
Estimates are free. Call now. (877) 959-0155
Sources checked for this page: sos.ga.gov/page/division-master-and-journeyman-plumbers-faq · sos.ga.gov/page/utility-contractors-faq · law.onecle.com/georgia/title-43/43-14-2.html · www.gwinnettcounty.com/government/departments/water/get-educ...
How a job runs
Camera first. Always.
A sewer quote given without video is a guess, and guesses are how homeowners end up paying for a liner that was never going to fix the problem. Here's the sequence we follow on every job.
-
Step 1
Describe the symptom, then stop talking price
Backups, gurgling, a wet patch in the yard, or a sewer-scope report from a home inspection. A contractor who names a number at this point is guessing, and a guess is what you will be paying for.
-
Step 2
Camera through the full line, recorded
From the cleanout to the main, with distances on screen and each defect located from above with its depth. You keep the recording. No price exists until this is done.
-
Step 3
License, insurance and permit, checked by you
Look the license number up on the state or local register named in your state's guide. Ask for the insurance certificate. Ask who pulls the permit and which inspections follow; your state page says what the answer should be.
-
Step 4
A written scope that names the alternatives
Footage, diameter, method, access points, reinstated connections, restoration, warranty, and a sentence on why the other methods were set aside. Two or three of these are what you compare, not two or three phone quotes.
-
Step 5
The work, with the inspections on the calendar
A lined lateral is usually a day; a burst lateral one to two; an open cut depends on depth and surface. The utility inspection and the post-work video are scheduled before the crew arrives, not remembered afterward.
-
Step 6
Final video, warranty and permit sign-off in your file
The camera goes back through the finished pipe while you watch. That recording, the written warranty and the closed permit are what the next buyer's inspector will ask for.