Skip to content

How to hire a sewer contractor, in every state · Open 24/7

(877) 627-4401

Sewer Contractors Sewer Contractors — How to choose and hire a sewer contractor, state by state

Massachusetts · Verified contractor available

How to Hire a Sewer Contractor in Massachusetts

Massachusetts hands a sewer job to two trades. Inside the house and for ten feet past the foundation it is plumbing, owned by a state-licensed plumber. Beyond that it is a drain layer's job, and drain layers are licensed by the town, not the state. Here is how that works in Boston, Worcester and Springfield, who signs the permit, and where your pipe stops being yours.

Estimates are free. Call now. · Open 24 hours, 7 days a week

CIPP Verified Installer badge

New England Pipe RestorationMassachusetts's verified sewer contractor, based in Leominster, MA

Estimates are free. Call now. (877) 627-4401

Who licenses sewer contractors in Massachusetts

The Board of State Examiners of Plumbers and Gas Fitters, inside the Division of Occupational Licensure, issues journeyman and master plumber licenses, and board policy puts the edge of plumbing at ten feet beyond the inside face of the foundation wall. Everything from there to the public sewer is a building sewer, and in Massachusetts that pipe belongs to the drain layer. There is no state drain layer license. Each city or town issues its own, usually through the sewer department, the Department of Public Works or the Board of Health, and most want a bond and liability certificate on file first. Boston goes further: the Boston Water and Sewer Commission keeps a roster of contractors it has licensed and bonded for lateral work, and only those firms may touch the connection. A full lateral renewal therefore needs a master plumber for the first ten feet and a drain layer licensed in that municipality for the rest, often the same company. Check the plumber in the state's Check a License tool, then ask the sewer office about the drain layer license.

Permits and inspections

The sewer connection permit comes from whoever owns the main. In Boston that is the Boston Water and Sewer Commission, which inspects the connection; the city's Public Works Department separately permits the street opening. Worcester routes sewer permits through its Department of Public Works and Parks, Springfield through the Springfield Water and Sewer Commission. Smaller towns such as Andover issue the sewer permit at the Board of Health plus a trench permit, which Massachusetts law requires for any excavation deeper than three feet. The inspector views the open trench and the wye before backfill, and many towns require a backwater valve and cleanout during any repair if none exists. For lining, the post-cure video stands in. Dig Safe needs seventy-two hours' notice. The drain layer files the applications.

Who owns the pipe under the street

Boston is blunt about it: the property owner is responsible for the lateral from inside the basement all the way to the connection at the commission's main under the street. The commission maintains the main and nothing else. It does offer a one-time grant toward renewing a verified blocked or collapsed lateral, one reason to call the commission before a contractor. Most other Massachusetts municipalities follow the same owner-to-the-main model, though a handful maintain the segment in the public way. Ask the sewer department in writing. The Massachusetts term is the building sewer or house connection; Boston says lateral. There is no statewide point-of-sale sewer inspection, although Title 5 applies to septic properties.

What is under Massachusetts, and why it shapes the bid

Glacial geology drives Massachusetts bids. Much of the state sits on dense till laced with boulders, and ledge can appear a few feet down in Quincy, Lynn and the hill towns, so a rock clause is normal. Boston's Back Bay, the South End and parts of Cambridge and Somerville are filled tidal flats with a high water table and wood-pile foundations, where dewatering and trench support cost real money. Frost reaches roughly four feet, so laterals run deep. Triple-deckers and rowhouses from the 1880s through the 1920s carry vitrified clay and cast iron connections. Postwar subdivisions around Framingham and Brockton used Orangeburg fiber pipe now crushing; PVC took over by the late 1970s.

For the lining methods themselves, the Sewer Pipe Lining Massachusetts pipe lining guide goes into what fails in the ground here and which method fits.

What a Massachusetts sewer bid must include

  • The master plumber's Massachusetts license number for the first ten feet and the drain layer license number for that city or town.
  • Which permits the contractor will file: sewer connection, trench and street-opening, each named.
  • In Boston, confirmation that the firm appears on the Boston Water and Sewer Commission's licensed and bonded lateral contractor roster.
  • Rock excavation and dewatering as separate unit-priced allowances with a stated depth assumption.
  • Pavement, sidewalk and lawn restoration to city standard, and inspector sign-off before backfill.

The full checklist, for any state, is on what a sewer bid should include.

Red flags in Massachusetts

  • A company that cannot show a drain layer license from the municipality where the work sits, since Massachusetts has no statewide version.
  • A Boston quote from a contractor absent from the commission's bonded roster, which also forfeits the lateral grant.
  • A bid treating the pipe beyond ten feet from the foundation as plumbing only, skipping the sewer department permit.
  • No Dig Safe ticket and no trench permit for a dig that will exceed three feet.

A vetted sewer contractor in Massachusetts

Sewer repair, lining, bursting and replacement in Massachusetts are performed by Massachusetts pipe lining crews based in Leominster, covering all of Massachusetts. They are listed in the CIPP Verified Installer directory, which means licensing, completed work and equipment were checked before the listing went live, and every bid starts with a recorded camera inspection.

Estimates are free. Call now. (877) 627-4401

Where Massachusetts property owners ask for help most

The rules above apply statewide; the communities below are the ones that generate the most questions.

Boston
Worcester
Springfield
Cambridge
Lowell
Brockton
Quincy
Lynn
New Bedford
Newton
Somerville
Framingham
Fall River

Massachusetts sewer contractor questions

Who is allowed to renew a sewer line in Massachusetts?

Two licenses. A plumber licensed by the Massachusetts Board of State Examiners of Plumbers and Gas Fitters handles the building drain out to ten feet beyond the foundation. From there to the main, a drain layer licensed by that city or town does the work. Many firms hold both.

Does Boston pay for any part of a sewer lateral repair?

Partly. The Boston Water and Sewer Commission runs a lateral assistance grant that reimburses a portion of a verified blockage or collapse repair once every ten years, provided the owner uses a commission-bonded contractor and gets three estimates. The lateral itself stays the Massachusetts owner's responsibility to the main.

Is a trench permit really required for a Massachusetts sewer dig?

Yes. State law requires a municipal trench permit for any excavation deeper than three feet, and a lateral renewal nearly always is. It is separate from the sewer connection and street-opening permits, so a Massachusetts bid should list all three.

Where does my responsibility end in Worcester or Springfield, Massachusetts?

Usually at the main. Worcester's Department of Public Works and Parks and the Springfield Water and Sewer Commission both generally treat the whole house connection as private, including the part under the street, though each will confirm for a specific address. Ask before accepting a bid for street work.

How do I check a Massachusetts plumber's license?

Use the Check a License search run by the Division of Occupational Licensure, which shows license type, status and expiration. For the drain layer license, call the sewer office where the property sits, since Massachusetts municipalities keep their own rosters.

The short version for Massachusetts

In Massachusetts, camera first. Then call the sewer department, because the permit, the drain layer license and any grant live there, and in Boston the commission must verify a collapse before it pays. Verify the plumber through the state board and the drain layer through the town. Compare bids that name every permit and carry rock and water allowances. Keep the inspection card and video.

Estimates are free. Call now. (877) 627-4401

Sources checked for this page: www.mass.gov/dpl/boards/pl · www.mass.gov/policy-statement/definition-of-plumbing · www.bwsc.org/residential-customers/programs-and-guidelines/s... · www.andoverma.gov/DocumentCenter/View/112/Sewer-Permitting-F...

How a job runs

Camera first. Always.

A sewer quote given without video is a guess, and guesses are how homeowners end up paying for a liner that was never going to fix the problem. Here's the sequence we follow on every job.

  1. Step 1

    Describe the symptom, then stop talking price

    Backups, gurgling, a wet patch in the yard, or a sewer-scope report from a home inspection. A contractor who names a number at this point is guessing, and a guess is what you will be paying for.

  2. Step 2

    Camera through the full line, recorded

    From the cleanout to the main, with distances on screen and each defect located from above with its depth. You keep the recording. No price exists until this is done.

  3. Step 3

    License, insurance and permit, checked by you

    Look the license number up on the state or local register named in your state's guide. Ask for the insurance certificate. Ask who pulls the permit and which inspections follow; your state page says what the answer should be.

  4. Step 4

    A written scope that names the alternatives

    Footage, diameter, method, access points, reinstated connections, restoration, warranty, and a sentence on why the other methods were set aside. Two or three of these are what you compare, not two or three phone quotes.

  5. Step 5

    The work, with the inspections on the calendar

    A lined lateral is usually a day; a burst lateral one to two; an open cut depends on depth and surface. The utility inspection and the post-work video are scheduled before the crew arrives, not remembered afterward.

  6. Step 6

    Final video, warranty and permit sign-off in your file

    The camera goes back through the finished pipe while you watch. That recording, the written warranty and the closed permit are what the next buyer's inspector will ask for.

Free Estimates

Find out what's actually wrong with your sewer line in Massachusetts.

Tell us what's happening and where the property is. New England Pipe Restoration, Massachusetts's verified sewer contractor, gets a camera on the line and you get the footage, a written finding and a straight recommendation — including when trenchless is not the right answer.

Estimates are free. Call now. (877) 627-4401
  • ✓ Camera inspection before any quote — no guessing
  • ✓ A written scope that names the method and why the alternatives were set aside
  • ✓ Contractors prequalified: 5+ years in business, 4.5-star Google rating or better
  • ✓ Homes, commercial buildings and municipal systems

Request a free estimate

We will contact you within 24 hours. In a hurry? Call now.

Estimates are free. Call now: (877) 627-4401.